RECENT PROJECTS.

New Mater
Public Hospital
Dublin, Ireland
New Doha
International Airport
CP 11, 26 & 94
Doha, Qatar
UCD Student
Learning Leisure and
Sports Facility
Dublin, Ireland
Dublin Airport
Terminal 2
Dublin, Ireland
St. Vincents
Private Hospital
Dublin, Ireland
St. Vincents Hospital
Cystic Fibrosis Unit
Dublin, Ireland
New Doha
International Airport
CP19
Doha, Qatar
Scope of Works: HVAC Tests and Date of Completion: November 2012
Balance & Validation Duration: 10 Months
Client: L Lynch and Company
In November 2012 SiBS completed commissioning and validation works on this new 45,000m2 addition to the existing hospital campus.
New Facilies Include:
  • New Accident & Emergency Department
  • New Outpatients Department
  • 12 New Theatres and ICU/HDU Departments
  • New Radiology Department
  • 120 Replacement Beds, 100% of which are single rooms
  • Expansion space with capacity for 70 single rooms
  • New CSSD, Catering and Waste Management Departments
  • New Energy Centre
  • 444 Space Basement Car Park on two levels
Scope of Works: Noise and Vibration Testing Client: ADCC JV
Testing of Backflow Date of Completion: May 2012
preventers Duration: 2 Months
In May 2012 SiBScompleted noise and vibration testing on behalf on the client on CP 11 (Airline Support Facilities), CP 26 (Maintenance Hangars) & CP 94 (Airport Operations Facilities). In addition to the scope of works above, SiBS carried out testing of the backflow preventer on CP 11 on behalf of the client.
Scope of Works: Commissioning Client: Designer Group
Management, HVAC Date of Completion: May 2012
Test and Balance Duration: 5 Months
In 2012, SiBS completed this project on behalf of Designer Group. The project expansion of the original Student Centre to include a dance studio, drama theatre, debating chamber, music recital space, multi-media centre, gym and swimming pool. Also included is a suite of presentation rooms and space for further health and counselling services.
Scope of Works: HVAC Test and Date of Completion: February 2011
Balance Duration: 8 Months
Cient: Mercury Engineering
SiBS carried out HVAC Test and Balance on the facility set out over an area of 75000m2. The T2 project includes a new terminal building and a new departures gate area called Pier E. SiBS provided the necessary commissioning teams to carry out an effective handover of the project to the client within a very tight timeframe.
Scope of Works: Commissioning Client: H.A.O'Neill
management Date of Completion: April 2011
& HVAC Test and Duration: 5 Months
Balance/Validation
In 2011, SiBS completed commissioning works on the largest acute private hospital in Dublin. The hospital offers 236 In-patient beds, 30 Daycare beds, 22 Oncology Daycare beds, Operating Theatres, Endoscopy Suites, Angiography, MRI, CT Scan, Ultrasound, Mammography, Dexa scanning, Intervention Radiology, Pulmonary Lab, Urodynamics, Cardiology Facilities, a High Dependency Unit, A & E X-ray departments. Other facilities include consultants' suites, pathology, pharmacy, restaurant and general administration space. The two level basement of 12,000sq.m houses all the plantrooms and 250 parking spaces.
Scope of Works: Commissioning Client: Rotary Group
management Date of Completion: June 2012
& HVAC Test and Duration: 5 Months
Balance/Validation
In June 2012, SiBS completed commissioning works on this development. The project comprised over 100 individual bedroom units and isolation rooms located on the grounds of the existing hospital campus. Also included in the project was a 10-bed day treatment unit with en-suite sanitary facilities which are an essential part of approach to CF treatment to prevent cross infection. This 7 storey development is situated over a basement of 1000sq.m which links the ward block to the existing hospital buildings.
Scope of Works: QC audit of Client: SEPAM
mechanical installation Date of Completion: June 2012
in Car Parks and Duration: 3 Months
Mosque
SiBS carried out HVAC Test and Balance on the facility set out over an area of 75000m2. The T2 project includes a new terminal building and a new departures gate area called Pier E. SiBS provided the necessary commissioning teams to carry out an effective handover of the project to the client withing a very tight timeframe.