The Wyeth Biotechnology Campus in Dublin, Ireland, was opened in September 2005. It was originally built at an estimated cost of $1.8bn. The facility became part of the Pfizer’s assets in October 2009 when it acquired Wyeth. SiBS were employed by Jacobs Engineering during the construction phase to carry out the commissioning of the Drug Product and Drug Substance Buildings.
-
SiBS were employed by Jacobs Engineering during the construction phase to carry out the commissioning of the Drug Product and Drug Substance Buildings.